Project Teams


CPM Enterprise is currently working with the Keweenaw Brewing Company, a local beverage distributor. The company is expanding their business and CPM is currently assisting them to make their can loading easier and more effective into their canning machine.:

Powertrain Team

 
  • Design an automated lift for the can pallets to be loaded into the canning machine.
  • Design and construct a trough and helix to move cans into the machine.
  •  

    Frame Team

     
  • Design and construct a frame for the lifting mechanism.
  • Perform a FMEA analysis of the lifting system.



  • Michigan Tech
    © 2009 [CPM]. All Rights Reserved.